News

26 October 2026

How process integration redefines efficiency in tube bending

FROM 7 OPERATIONAL STEPS TO 3. FROM 7 INTERVENTIONS TO 2.

Redesigning the production process to make it simpler, more integrated, and more efficient.

For a press-fitting application on large-scale components - with diameters ranging from Ø76 to Ø108 mm in stainless steel (INOX) RM = 1D - the challenge was to reduce manual tasks and integrate multiple operations into a single work cycle.

THE SOLUTION: CRIPPA 114LE

Integrating the Crippa 114LE tube bending machine made it possible to simplify the process, reducing both operational steps and operator interventions.

THE RESULT

7 → 3 operational steps

7 → 2 operator interventions

FEWER STEPS. GREATER INTEGRATION.

A concrete change that translates to: • Fewer steps to manage • Fewer manual interventions • Less material handling between processes • A more integrated and organized production process

AUTOMATION MEANS RETHINKING THE PROCESS.

Efficiency isn't just about execution speed - it's about eliminating unnecessary steps, simplifying workflows, and focusing resources on higher value-added operations.

The most effective automation solutions start with a deep analysis of real production needs.

Restons en contact !

Restez informé des dernières actualités sur les événements, initiatives et salons, et profitez d’un aperçu exclusif des lancements de nouveaux produits.

Contactez-nous